Lagoon digging etc.

Using a 22-ton excavator to dig out a lagoon/swimming pool, no Environmental Impact Statements required. Flushes at high tide, already got plenty of fish and a small octopus. The excavator makes the place look like a war zone, I’m already remediating with new local plantings. Gonna be great.

22-ton excavator making a mess

plenty of work to make it look natural again

pretty inviting...(no)

already clearing up at high tide

kitchen sink

making windows, fixtures, cabinets etc. from scratch takes forever

rustical

Advertisements
This entry was posted in Uncategorized. Bookmark the permalink.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s